![](/media/1xfdakm0/large_17391_photo_ba12a921-cc43-4b9e-80e063a1fde2f218.jpg?anchor=center&mode=crop&width=350&height=200&rnd=132289364601670000)
Debris Clearance
Stonbury was contracted by the Environment Agency to clear debris from a ‘dragon’s teeth’ flow device, that has been designed to break up and dissipate the water flow before a bend in the river and to protect strategic pumping assets. The scope also included strimming along a 300m stretch of the riverbank.