Water 20 September, 2022 Spillway & Head Wall Maintenance & Repair As part of a large multi impounding reservoir spillways programme, Stonbury was contracted to complete works to a historic spillway and head wall as part of both safety and maintenance requirements.
Environment 31 August, 2022 Sluice Gate and Channel Works Stonbury was employed by the Environment Agency to complete refurbishments to a sluice gate and associated structures on the River Toe.
Wastewater 25 August, 2022 Sludge Tank Refurbishment As part of a significant multi-site wastewater treatment works framework, Stonbury was pleased to deliver the refurbishment of a brick sludge tank, returning the vital asset back to service.
Environment 28 July, 2022 Green Engineering Stonbury is pleased to deliver a wide range of green engineering solutions that enable the water and wastewater industries to operate sustainably and help mitigate the effects of climate change.
Water 28 July, 2022 Large-Scale Reservoir Refurbishment Stonbury was pleased to support delivery of a large-scale distribution service reservoir refurbishment project, working as a sub-contractor for ESD Joint Venture. ESD is a Scottish Water design and construction partner engaged in the upgrade of water and wastewater treatment facilities. By the end of this decade, it will have delivered more than £1.2 billion worth of projects in Scotland.
Environment 28 June, 2022 Weed and Vegetation Management Stonbury is equipped to assist clients with the management of non-native and overgrown native weeds from within and around watercourses, using a range of methods to suit the environment and type of vegetation.
Wastewater 27 June, 2022 Marine Outfall Repairs Stonbury was contracted to design and deliver repairs to four outfalls which form part of a wastewater treatment works in the northeast of Scotland.
Environment 31 May, 2022 Water Asset Dechlorination As a responsible contractor, Stonbury is pleased to assist clients in potable water asset dechlorination to ensure protection of the environment during cleaning and draining procedures.
Environment 31 May, 2022 Pumping Station Bridge Replacement A specialist Stonbury team was deployed to undertake the replacement of a bridge for the Environment Agency.
Environment 29 April, 2022 Railway Culvert Repairs Stonbury was awarded a scheme to carry out brickwork repairs to a 50-metre-long Victorian-built flood alleviation culvert under a live railway.
Water 29 April, 2022 Spillways Programmes Stonbury is currently engaged in a two large spillway inspection and refurbishment programmes in the north of England.
Environment 31 March, 2022 Flood Mitigation Stonbury was contracted by the Environment Agency to complete an initial vegetation cut, followed by other flood mitigation measures on an 800-metre stretch alongside the River Isbourne.