Wastewater 11 May, 2023 STORM TANK UPGRADE SOLUTION Stonbury has been working with water companies across the UK to deliver solutions that ensure its clients comply with new Environment Agency (EA) storm tank regulations.
Environment 27 April, 2023 Invasive Species Control Stonbury’s specialist environmental management team are deployed on an annual rotation to tackle invasive native and non-native plant species within and around UK waterways.
Wastewater 27 April, 2023 Storm Tank Installation Stonbury delivered a 55m3 sectional steel storm tank on a wastewater treatment site to facilitate compliance with new storm volume regulations.
Environment 28 March, 2023 Environment Programmes Stonbury delivers a broad range of services within the water environment for trusts, councils and environmental agencies throughout England and Wales.
Wastewater 23 March, 2023 Trickling Filter Column Repairs Stonbury was contracted to make repairs to several column supports for the distribution system surrounding a filter bed at a wastewater treatment site.
Water 28 February, 2023 Pipe Bridge Refurbishment Stonbury was contracted to carry out refurbishment works to two pipe bridges located on the River Chelt.
Water 28 February, 2023 Water Tower Valve Replacement Stonbury was pleased to deliver replacements to several gate valves within a water tower during a four- week programme.
Environment 26 January, 2023 Riverbank Badger Exclusion Stonbury was enlisted by the Environment Agency to relocate badgers and install netting to exclude wildlife from a section of river embankment in preparation for strengthening works.
Wastewater 26 January, 2023 Sludge Tank Foundations Stonbury was contracted to deliver a concrete slab base and associated groundworks for a new sludge tank on a sewage treatment site in the north of England.
Wastewater 21 December, 2022 Constructed Wetland Refurbishment Stonbury carried out refurbishments to several constructed wetlands on a Water Recycling Centre (WRC) in the west of England.
Water 16 December, 2022 Steel Tank Refurbishment & Roof Replacement Stonbury was contracted to refurbish and replace the roof on an above-ground, modular bolted glass-fused-to-steel (GFS) tank.
Environment 29 November, 2022 Emergency Bank Stabilisation Works Stonbury delivered emergency bank stabilisation works as part of a new River Restoration Framework in the north of England.