Wastewater 23 March, 2023 Trickling Filter Column Repairs Stonbury was contracted to make repairs to several column supports for the distribution system surrounding a filter bed at a wastewater treatment site.
Water 28 February, 2023 Pipe Bridge Refurbishment Stonbury was contracted to carry out refurbishment works to two pipe bridges located on the River Chelt.
Water 28 February, 2023 Water Tower Valve Replacement Stonbury was pleased to deliver replacements to several gate valves within a water tower during a four- week programme.
Environment 26 January, 2023 Riverbank Badger Exclusion Stonbury was enlisted by the Environment Agency to relocate badgers and install netting to exclude wildlife from a section of river embankment in preparation for strengthening works.
Wastewater 26 January, 2023 Sludge Tank Foundations Stonbury was contracted to deliver a concrete slab base and associated groundworks for a new sludge tank on a sewage treatment site in the north of England.
Wastewater 21 December, 2022 Constructed Wetland Refurbishment Stonbury carried out refurbishments to several constructed wetlands on a Water Recycling Centre (WRC) in the west of England.
Water 16 December, 2022 Steel Tank Refurbishment & Roof Replacement Stonbury was contracted to refurbish and replace the roof on an above-ground, modular bolted glass-fused-to-steel (GFS) tank.
Environment 29 November, 2022 Emergency Bank Stabilisation Works Stonbury delivered emergency bank stabilisation works as part of a new River Restoration Framework in the north of England.
Wastewater 29 November, 2022 FILTER TANK REFURBISHMENT As part of a wastewater framework, Stonbury was enlisted to complete refurbishment works to a filter tank in the north of England.
Water 26 October, 2022 GAC TANK REFURBISHMENT Stonbury was pleased to refurbish two granular activated carbon (GAC) tanks on a water treatment site in the north of England.
Water 12 October, 2022 Service reservoir demolition & new build After demolishing a condemned prestressed tank, Stonbury returned to build a new, larger capacity, eight megalitre tank to serve new housing developments in the area.
Wastewater 20 September, 2022 Storm Tank Repairs Stonbury was enlisted to complete emergency repairs to a storm tank floor after leakage was discovered through several areas in the floor.