REEDBED REFURBISHMENTS (1)
Stonbury were engaged to carry out refurbishment works to a reedbed system at a Water Recycling Centre (WRC) in the South of England. The site serves a small community, with the reed bed providing settlement and treatment capacity for effluent before it reaches the watercourse. The works were required as the reedbed had ceased to be effective, due to sludge, overgrown reeds and leaf litter.