Water 11 May, 2017 Break Tank Construction Stonbury were commissioned to construct a new concrete break tank at a Water Treatment Works. The purpose of the new tank is to allow the water company to decommission an existing contact tank.
Water 11 May, 2017 GAC Backwash Tank Refurbishment Stonbury refurbished a GAC backwash tank at a Water Treatments Works following an inspection and clean that we recently carried out for the client. Report findings showed that extensive internal and external refurbishment works were needed. Works involved internal joint refurbishment and minor steel work coating repairs to the outlet pipe to both cells of the tank. We were also contracted to clean the cells ready for return to service at works completion.
Water 11 May, 2017 Internal & External Service Reservoir Refurbishment Stonbury have completed extensive internal and external refurbishment works for one of our framework clients, to a service reservoir approximately 100 years old.
Water 23 February, 2017 Water Treatment Works Contact Tanks Refurbishment Stonbury were recently awarded the contract for the repair and refurbishment of internal contact tanks within a Water Treatment Works facility.
Water 27 January, 2017 Staircase Schemes To address the issue of safe access across several sites for a framework client, we recently completed a scheme to install new access staircases and handrails to tanks, where any existing staircases were not meeting client standards, or none were present.
Water 28 October, 2016 Live Working To increase our project productivity and client satisfaction levels, we are constantly in search of innovative methods that will allow our works to be carried out to the same high levels of safety and efficiency, without compromising quality.
Water 18 October, 2016 Media Bays Works were recently completed at two separate Water Treatment Works to increase the aggregate storage capacities. In total, six new standalone bays were constructed and a further two existing bays extended for increased capacity, used to store dirty sand, clean shingle, dirty shingle and carbon.
Water 8 July, 2016 Water Tower Steel Roof Fabrication Stonbury were tasked with a refurbishment project for a Water Tower built in year 1910 in South East London. The building is an octagonal brick built tower which houses a 7.5m diameter x 22m high riveted cast iron water storage tank. A distance of only one metre between the tank and the tower wall was available for access and a long stair well which circulated the inner perimeter of the tower wall was the only means to access the tank roof.
Water 8 July, 2016 Service Reservoir Minor Civils Services At Stonbury, we have a clear understanding of our clients strict requirements for working on drinking water reservoir sites, this knowledge would put us in a good position for undertaking any enabling works which may be required to facilitate service reservoir drawdowns.
Water 8 July, 2016 Sample Tap Chamber Construction Stonbury’s new civil engineering division have recently been awarded a minor civils package by one of their existing reservoir refurbishment framework clients.
Water 8 July, 2016 Reservoir Dividing Wall Construction Stonbury were commissioned to undertake internal and external refurbishment works to a service reservoir for one of our framework clients.
Water 8 July, 2016 M&E & Pipework Inlet Alterations After Stonbury had completed the internal and external refurbishment of this service reservoir, our client asked us to carry out adaptions and improvements to the inlet pipework.