Wastewater 27 November, 2024 Primary settlement tank repairs Stonbury’s concrete repair work has prolonged the life of a primary settlement tank on a sewage treatment works in the Midlands.
Environment 27 November, 2024 Grounds Maintenance Programme Stonbury is providing grounds maintenance at multiple sites across Yorkshire as part of an ongoing maintenance programme.
Wastewater 27 October, 2024 Start Up To Waste bag Replacement Stonbury attended an emergency response to replace a Start Up To Waste (SUTW) bag on a wastewater treatment site in the Northwest after the existing bag had failed.
Water 22 October, 2024 Spillway Repair Stonbury was contracted to deliver repairs to a spillway in Lancashire after the existing gabion baskets supporting the structure had degraded.
Wastewater 25 September, 2024 Storm Tanks Stonbury’s storm tank programmes ensure clients adhere to minimum storage requirements to help solve the problem of excess overspills.
Water 18 September, 2024 Gauging Station Equipment Installation Stonbury was instructed to design, manufacture and install a bespoke two-headed, pole-mounted radar bracket to measure water height levels at a gauging station in the midlands.
Water 20 August, 2024 Surge vessel revitalisation Stonbury was recently tasked with revitalising a surge vessel to extend its operational life and ensure compliance with industry regulations.
Environment 29 July, 2024 Fish Rescue and Relocation Stonbury is pleased to have completed a fish rescue and relocation on behalf of the Environment Agency to protect fish from harm prior to scheduled de-silting works.
Water 29 July, 2024 Steel tank refurbishment Stonbury refurbished a steel potable water tank to prolong its length of service by two decades.
Environment 28 June, 2024 BANK REINSTATEMENT AND EROSION PROTECTION Stonbury delivered a long-lasting hybrid green engineering solution to re-shape and stabilise a section of riverbank after the existing sandstone retaining wall had eroded.
Water 27 June, 2024 Loose liner installation A loose-lay liner solution has provided long-lasting ingress protection to a steel contact tank within a rapid timeframe.
Environment 30 May, 2024 Headwall Replacement Stonbury has been contracted by the Environment Agency to replace the headwalls on a storm water drainage pipe in an embankment that had become destabilised by natural erosion.