Case studies of our projects across the UK.

Historic reservoir refurbishment
Stonbury returned to a historic site to complete a large-scale refurbishment on a grade II listed stone reservoir. A roof was placed over the original build in the mid-twentieth century, and Stonbury were contracted nine years ago to install a Reg 31 Hylam liner due to ingress.

Flood bank slippage repair
Stonbury was called in by the Environment Agency to solve a challenging problem. A mud flood bank on the River Avon at Pill had slipped, threatening the integrity of residential flats that were situated alongside a stretch of the tidal reach. The void had to be infilled with stone on a geotextile base to re-establish the integrity of the bank, however, access to the site proved to be quite a challenge.