It was decided that this section of sandstone blocks be lifted and that 300mm depth of puddle clay be removed, to include a 500mm deep central ‘toe’, and replaced with a new re-inforced concrete slab.
After completion of this work, the sandstone blocks were bedded back in their original positions, to include some new replacements, and re-pointed.
This work was undertaken during August when the reservoir was at a natural low level.