Relying on previous experience gained with similar but smaller schemes for other Water Companies, Stonbury were able to provide a successful alternative utilising prefabricated DWI Approved Polypropylene Sheet Membrane sections, site welded together.
A specially designed stainless steel fixing and termination system was employed, to ensure the total integrity of the system and a geotextile backing fleece ensured that no damage was caused in service from the variable concrete surfaces of the aqueduct.