Case studies of our projects across the UK.

Large-scale weir removal
On behalf of the EA we successfully opened 340 miles of catchment in the largest project of its kind - in the country - by removing a 70 meter wide, 900 year old medieval weir. Removing the weir significantly improved fish migration, spawning grounds and habitat. Fallen water levels have also allowed natural ecological processes to recommence.

Storm tank installation
A 55 cubic metre sectional-steel storm tank with sustainable features was installed at a wastewater treatment site to comply with regulations to cut sewage overflows. The works significantly reduced running costs for our client and allowed them to meet specified carbon reduction targets while increasing stormwater capacity to help protect local waterways for decades to come.

Historic reservoir refurbishment
Stonbury returned to a historic site to complete a large-scale refurbishment on a grade II listed stone reservoir. A roof was placed over the original build in the mid-twentieth century, and Stonbury were contracted nine years ago to install a Reg 31 Hylam liner due to ingress.