Case studies of our projects across the UK.

Invasive species clearance
Stonbury was contacted by a local council regarding an on-line balancing pond that was built on the Moorgreen Stream, due to overgrowth of Typha latifolia (bulrush/reedmace) and the presence of the invasive non-native Hydrocotyle ranunculoides (floating pennywort) identified by the Environment Agency.

Debris clearance
Stonbury was contracted by the Environment Agency to clear debris from a ‘dragon’s teeth’ flow device, that has been designed to break up and dissipate the water flow before a bend in the river and to protect strategic pumping assets. The scope also included strimming along a 300m stretch of the riverbank.