Case studies of our projects across the UK.
Improving water conveyance
Flash flooding has become a major challenge across the UK affecting both water catchment and the wastewater network, making projects that maximise water conveyance and reduce flooding a vital part of our work. This particular project re-enabled the effective operation of a flood storage area upstream.
Invasive species clearance
Stonbury was contacted by a local council regarding an on-line balancing pond that was built on the Moorgreen Stream, due to overgrowth of Typha latifolia (bulrush/reedmace) and the presence of the invasive non-native Hydrocotyle ranunculoides (floating pennywort) identified by the Environment Agency.