Working closely with the Environment Agency, Stonbury designed a pumped eel pass using three modern ram pumps. The total lift was 9m over 18m to ensure that the eels and elvers could be dropped into still water.
Prior to fabrication, the design was tested using CAD systems and once approved, was fabricated inhouse. The eel pass was then assembled in the workshop to check accuracy before installation on-site.
The installation was carried out with no disruption to the function of the monitoring station, and within 24 hours of commissioning, the first elver was recorded using the new eel pass.
As a result of the work done for this project, the team received the ‘Environment Agency Project Excellence Award for Innovation’.