The installation presented challenges in terms of access and the construction of suitable foundation slabs. This involved the deployment of specialist coffer dams and the temporary diversion of the carrier stream.
The weed rack was installed with an associated timber walkway to provide access for future maintenance work and to an in-channel island with oak sluice gates to regulate the flow across the structure.