We completed a major refurbishment project at a strategically important water treatment works, extending the lifespan – by over 10 years – of a critical asset whilst mitigating the need for a costly and carbon intensive new build alternative.
Storm tank installation
A 55 cubic metre sectional-steel storm tank with sustainable features was installed at a wastewater treatment site to comply with regulations to cut sewage overflows. The works significantly reduced running costs for our client and allowed them to meet specified carbon reduction targets while increasing stormwater capacity to help protect local waterways for decades to come.
Large-scale weir removal
We successfully opened 340 miles of catchment in the largest project of its kind – in the country – by removing a 70 meter wide, 900 year old medieval weir. Removing the weir significantly improved fish migration, spawning grounds and habitat. Fallen water levels have also allowed natural ecological processes to recommence.
New build transformer concrete bunded base
Due to a flood event inside a high voltage building, which was situated on a Water Treatment Works, Stonbury were asked to relocate the existing transformer onto a new concrete bunded base and waterproof the building to prevent future ingress.
Public park desilt
Stonbury were contracted to carry out desilting works to an ornamental lake at a public park.
Outfall structure repairs
Stonbury was contracted to carry out comprehensive repairs to an existing outfall structure situated on a lake in the South West.
Pipe bridges refurbishment
As part of Stonbury’s extensive refurbishment activities to water industry structures, we were recently contracted to look at various steel pipe bridge refurbishment works in and around the London area.
Primary settlement tank repairs
Stonbury’s concrete repair work has prolonged the life of a primary settlement tank on a sewage treatment works in the Midlands.
Railway culvert repairs
Stonbury was awarded a scheme to carry out brickwork repairs to a 50-metre-long Victorian-built flood alleviation culvert under a live railway.
Rapid gravity filter tanks
Stonbury were recently contracted to carry out refurbishment works to 22 Rapid Gravity Filter tanks and outfall channels.
Reedbed refurbishment
Stonbury has completed works on a seventh bed as part of an ongoing framework to refurbish sixteen reedbeds on a raw water purification site in Southeast England.
Reedbed refurbishment works
Following a condition appraisal, Stonbury were contracted to complete refurbishment works to an existing reed bed, constructed to treat the leachate from a capped putrescible tip.
Reservoir dividing wall construction
Stonbury were commissioned to undertake internal and external refurbishment works to a service reservoir for one of our framework clients.
Reservoir refurbishment
Stonbury were contracted to complete internal and external refurbishment works to a large clean water reservoir.
Reservoir roof refurbishment
Working for a client on an individual tender, Stonbury replaced a roof membrane and all upstands and hatches on a reservoir in Southeast England.