M&E & pipework inlet alterations

After Stonbury had completed the internal and external refurbishment of this service reservoir, our client asked us to carry out adaptions and improvements to the inlet pipework.

M&E & pipework inlet alterations

This involved installing a new flow meter and an electric actuated position control valve (CPC Valve) to enable the client to have better control over levels within the reservoir.

Works scope includes:

  • Excavation of embankment to allow the new pipework to be installed
  • Installation of a double T and valve arrangement onto the existing water main
  • Installation of new pipework out of the existing chamber to the location of a new flow meter and CPC control valve
  • Construction of new flow meter chamber
  • Ducting to the existing buildings
  • Backfilling of the excavations and the existing chamber around the new valves
  • Electrical connections to the new pipework equipment and control panel