Case studies of our projects across the UK.

Diesel tanks & bunds
All surfaces to the tanks and bunds have been cleaned and prepared using specialist precision dustless blasting equipment, ensuring no contamination to other areas of the water treatment plant. Following preparation, all surfaces of the diesel tanks and pipe work have been protected by the application of a 3 coat high performance polyurethane coating. Bund areas have been locally repaired and protected by the application of a 2 coat chemically resistant epoxy coating.

Improving water conveyance
Flash flooding has become a major challenge across the UK affecting both water catchment and the wastewater network, making projects that maximise water conveyance and reduce flooding a vital part of our work. This particular project re-enabled the effective operation of a flood storage area upstream.