Diesel tanks & bunds
All surfaces to the tanks and bunds have been cleaned and prepared using specialist precision dustless blasting equipment, ensuring no contamination to other areas of the water treatment plant. Following preparation, all surfaces of the diesel tanks and pipe work have been protected by the application of a 3 coat high performance polyurethane coating. Bund areas have been locally repaired and protected by the application of a 2 coat chemically resistant epoxy coating.
New build reservoir partition wall
Stonbury were contracted to build a full-height division wall to create two separate compartments inside a potable water reservoir. This was due to the high demand for supply, which meant the tank could not be taken out of service for inspections and maintenance works.