Stonbury’s Head of Technical and Quality has visited sites to train teams on the correct application of the gasket. The method involves taking measurements – to custom make the gasket – lifting the hatch cover, cleaning the upstand and placing it into position before dropping the hatch back into place and securing by tightening the buts on the bolts.
The initial trial project comprised of two hatches, both of which were sealed effectively. As there is no cure time, the team was able to flood test immediately after installation, saving both time and cost to the client. The trial was a great success, demonstrating zero leakage upon testing.
Following approval from clients, Stonbury has now successfully used the gasket method on various schemes across the UK and anticipates this cutting-edge product will become a game-changer for the water industry.