Works scope includes:
- Excavation of embankment to allow the new pipework to be installed
- Installation of a double T and valve arrangement onto the existing water main
- Installation of new pipework out of the existing chamber to the location of a new flow meter and CPC control valve
- Construction of new flow meter chamber
- Ducting to the existing buildings
- Backfilling of the excavations and the existing chamber around the new valves
- Electrical connections to the new pipework equipment and control panel