Rock rolls were installed between the bank and the stakes to provide a robust and permanent revetment along the canal. Ground anchors were also installed along the bank, adding additional strength to the revetment.
Once fully secure, unplanted coir rolls were fixed into place on top of the rock rolls to provide further erosion control and rapid vegetation establishment.
The bank was then reshaped, and coir roll matting was laid to prevent future soil erosion and provide additional stabilisation to the bank. Finally, topsoil was distributed across the bank and surrounding areas, followed by grass seed.