Wastewater 21 December, 2018 WWTW Roof Replacement Due to water ingress into a high priority equipment building located on a waste water site, Stonbury were asked to complete a full inspection of the roof structure prior to recoating and waterproofing.
Wastewater 28 November, 2018 WWTW Tank Repairs Following a non-destructive testing (NDT) survey at a WWTW, it was identified that major concrete repairs were required to five tanks, to ensure the plant could remain in use. However, the works could only be undertaken during a full plant closure.
Wastewater 31 July, 2018 Wet Well Refurbishment Stonbury were contracted to undertake refurbishment works to a deteriorating waste water wet well. Inspection to the asset had found defected concrete surfaces and exposed and corroded steel reinforcement caused by hydrogen sulphide attack.
Wastewater 1 May, 2018 Lagoon Refurbishment A final settlement lagoon required repair and refurbishment work due to wildlife damage and bank slippage, which had caused the lagoon to leak. A ‘Land Drainage’ consent from the local council was required before the works to the channel could go ahead.
Wastewater 21 December, 2017 Lagoon Repair and Refurbishment To extend the life of two final settlement lagoons, Stonbury was required to carry out refurbishment works, which included repairs to the outfall structure, the installation of an EPDM liners and replacement pipework.
Wastewater 8 July, 2016 Steel Sludge Holding Tanks Refurbishment Stonbury, specialist contractors to the Water Industry, have recently completed the internal refurbishment of 2 steel sludge holding tanks.
Wastewater 8 July, 2016 Hartshill Digester Refurbishment Stonbury were recently commissioned to carry out refurbishment works to the gas zone of a Digester. The inspection to the soffit, revealed that the existing coating had failed and that the exposed concrete had suffered from attack by the Hydrogen Sulphide gases.