Water 29 October, 2021 Fill Point Injection Hatches A client approached Stonbury to produce a hatch solution that would eliminate the risk of potable water contamination during tankering operations.
Water 30 September, 2021 Wave Wall Investigation Stonbury was contracted to complete investigation works into the condition of an existing wave wall structure on an impounding reservoir.
Water 24 August, 2021 WTW Contact Tank Solution Stonbury was contracted to produce and install a new solution to increase the water quality output from two Water Treatment Works contact tanks, after the client’s recent step tests highlighted that at flows exceeding 20Ml/d, output failed to meet the minimum disinfection contact requirement.
Water 21 July, 2021 Historic Reservoir Refurbishment Stonbury returned to a historic site to complete a large-scale refurbishment on a grade II listed stone reservoir. A roof was placed over the original build in the mid-twentieth century, and Stonbury were contracted nine years ago to install a Reg 31 Hylam liner due to ingress.
Water 21 July, 2021 Reservoir Safety Stonbury is pleased to offer a range of services to improve the safety of impounding reservoirs and help clients meet their reservoir safety regime obligations.
Water 1 July, 2021 Surge Vessel Access & Lining Refurbishment As part of an ongoing inspection and maintenance programme, Stonbury was contracted to carry out refurbishment works to one of the client’s surge vessels. This included fitting a new manway and recoating the internal surfaces.
Water 1 June, 2021 Spillway Refurbishment Stonbury provides specialist inspection, maintenance and refurbishment of a variety of spillway structures to help clients ensure continued operational safety of large reservoirs.
Water 29 March, 2021 FILTER BED REFURBISHMENT As a part of an ongoing Slow Sand Filter Framework, Stonbury carried out refurbishment works to several filter beds that required repairs to the walls, and floor replacements due to deterioration over time and reduced performance.
Water 29 March, 2021 Access Track Installation Stonbury was contracted to construct a new trackway to improve access to a pumping station and extend the existing turning area. The works were required as the existing track became unusable during flood events and restricted emergency access to the pumping station.
Water 18 February, 2021 APPLICATION OF BONDED MEMBRANE TO CYLINDRICAL COLUMNS A client approached Stonbury to complete a routine flood test as a part of a flood test and cleaning programme. The flood test was carried out over five days due to the roof’s size - approximately 12500M2. The flood test revealed points of ingress and internal coatings that had failed.
Water 27 January, 2021 Service Reservoir Floor Refurbishment A framework client contracted Stonbury to carry out refurbishment works to a service reservoir floor where soft concrete issues had been identified. The floor surface had been deemed unsafe to walk on due to multiple slips, trips and falls inside the tank.
Water 21 December, 2020 Circular tank Insulation Installation Stonbury was asked to provide a solution that would shield two above-ground steel tanks from the summer heat. The works were required as the temperature during the summer months was promoting the growth of bacteria inside the water tanks.